Engineering Design Change Order Release Process

Industry:

Manufacturing

Region:

USA

Technology:

Bonita BPM

About the Client

Our client is a global leader in manufacturing material-handling forklifts used in the logging industry. The client was looking for a technology/platform that works across multiple devices.

The Solution
  • Change order request lifecycle.
  • Design data sync.
The Benefit
  • High visibility of change order process across 11 departments.
  • Automatic cancellation parallel approvals when one of them rejects.

Read The Full Case Study

Want to share this customer story